Off-shore Platforms

 

   The project consists of several small off-shore platforms, connected by means of covered bridges.

 

   We designed two of them – CTP and PJM:

 

   CTP – it is a platform for preparing of crude oil for transportation. It consists of two base blocks and upper platform

Offshore Platforms Drawing 1

 

 Base block CTP                Upper structure CTP
Height     – 15,50m            Height     – 32,00m
Breadth    – 24,50m            Breadth    – 45,00m
Length     – 34,00m            Height     – 88,00m
Full weight (2 blocks) -8280t    Full weight     -12000t

 

PJM – module for Accommodation of the staff is intended for about 125 persons .

It consists of two base blocks and upper platform

 

 Offshore Platforms Drawing 2

Base block CTP                  Upper structure CTP
Height     – 15,50m              Height     – 30,00m
Breadth    – 12,50m              Breadth    – 25,00m
Length     – 26,00m              Height     – 35,00m
Full weight (2 blocks) -3980t    Full weight     -1240t

 

 

 

Ship Design Models:

 

Offshore Platforms Model 1

 

Offshore Platforms Model 2

 

Offshore Platforms Model 3

 

Offshore Platforms Model 4

 

 


Copyright Marino Consult. All Rights Reserved.